First E&P Kicks Off Production from Anyala West Field

Must Read

List of United Bank for Africa (UBA) Sort Codes & Branches (with addresses) in Nigeria

The sort code is a number that usually identifies both the bank and the branch where an account is held. The sort...

List of Access Bank Sort Codes & Branches (with addresses) in Nigeria

The sort code is a number which usually identifies both the bank and the branch where an account is...

List of First Bank of Nigeria Sort Codes in Nigeria

The sort code is a number that usually identifies both the bank and the branch where an account is held. The sort...
- Advertisement -

Nigerian oil and gas company First E&P has this week announced it has started oil production from the Anyala West field offshore Nigeria.

First E&P Kicks Off Production from Anyala West Field
First E&P Kicks Off Production from Anyala West Field – www.brandspurng.com

The field is located in Oil Mining Leases (OMLs) 83 & 85, in the shallow waters offshore Bayelsa State, Nigeria, and the oil is being produced via the Abigail-Joseph FPSO. The FPSO, owned by Malaysia’s Yinson, arrived in Nigeria earlier this year.

According to First E&P, the Anyala – Madu field development project will develop 142 million barrels of oil and 98 billion standard cubic feet of gas from the fields in Phase 1.

A total of 7 development wells have been planned in Phase 1 and approved by the Department of Petroleum Resources (“DPR”) in the Anyala West field (OML 83) which will be developed along with the nearby Madu field in (OML 85) to be jointly produced in the Abigail-Joseph FPSO.

- Advertisement -

The FPSO is a 274 meters long converted Suezmax with a storage capacity of 700,000 barrel, oil processing capacity of 60,000 barrels of oil per day, produced water treatment of 20,000 barrels per day, and a gas handling capacity of 39 million standard cubic feet per day.

Read Also:  Nigeria’s Debt Stock Rises by 17.60% in 9 Months 2020 on USD3.45 billion IMF Loan
Read Also:  Dangote Cement Appoints Michel Puchercos As Group CEO; Joseph Makoju Retires

The project will, at its peak, produce about 60,000 barrels of oil per day, unlock over 300 million barrels of crude oil recoverable reserves and create value of over $8bn for the Federal Government of Nigeria over the total lifespan of all phases of the project, First E&P said.

The Abigail-Joseph FPSO has been chartered by First E&P on a firm seven-year contract with options to extend until 2035.

The firm part of the contract agreed in 2019, was valued at around $901.79 million.

- Advertisement -
First E&P Kicks Off Production from Anyala West Field - Brand SpurFirst E&P Kicks Off Production from Anyala West Field - Brand Spur

Subscribe to BrandSpur Ng

Subscribe for latest updates. Signup to best of brands and business news, informed analysis and opinions among others that can propel you, your business or brand to greater heights.

- Advertisement -

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

First E&P Kicks Off Production from Anyala West Field - Brand SpurFirst E&P Kicks Off Production from Anyala West Field - Brand Spur

Latest News

EXMAN Empowers Members On Tax, Pension Compliance

In a bid to ensure compliance and work within the details of the law, the Experiential Marketers' Association of...
- Advertisement -
BrandsPur Weekly Cartoons
- Advertisement -First E&P Kicks Off Production from Anyala West Field - Brand SpurFirst E&P Kicks Off Production from Anyala West Field - Brand Spur